From farmlandto solar field

A solar farm done very quickly and very well at the same time? Not a problem for The Green World Company. A solar farm of 600kWp in an east-west position gives a more even distribution of energy on the grid during the day. The rural integration of the installation was also taken into account: from the road, you simply look over the solar panels. With the construction of this solar park, the owner of Fluwel BV has made an excellent sustainable choice.

From farmland to solar field

Project information

  • LocationBurgerbrug, the Netherlands
  • ClientFluwel Beheer
  • Construction2020
  • Capacity600 kWp